Pioneer Power Inc. ×
  • Services
    • Overview
    • Pipe Fabrication
    • Pipefitting
    • Metal Fabrication
    • HVAC
    • Plumbing
    • Project Management
    • Maintenance
  • Markets
  • Projects
  • Quality & Safety
  • About
  • Contact
  • Bid Information
  • Upcoming Projects
Pioneer Power > Projects > Central Corridor Light Rail Transit
  • Central Corridor Light Rail Transit
  • Central Corridor Light Rail Transit
  • Central Corridor Light Rail Transit
Previous 1/3 Next

Central Corridor Light Rail Transit

OWNER: Metropolitan Council
Market | Industrial
LOCATION:

St. Paul, MN

STATUS:

4th Street Advanced Utilities was completed November 2010; Civil East Construction was completed September 2012

PROJECT DURATION:

Two years for each

Highlights

  • Relocated and installed 6,550 feet of chilled water piping (ranging in size from 6 to 24 inches in diameter) and 12,245 feet of hot water piping (ranging in size from 3 inches to 16 inches in diameter), as well as numerous critical overnight building tie-ins for District Energy St. Paul.
  • Subcontracted and managed the civil/excavation, electrical, insulation, and NDE (nondestructive examination) portions of the project.
  • Met all milestones and completion dates.
Next Project
Next Project
View Project List

Services

Project management, Pipe fabrication and installation,

Safety Performance

Zero OSHA recordable injuries or lost time accidents.

©2025 Pioneer Power, Inc.

2500 Ventura Drive | Woodbury, MN 55125

651-488-5561

  • Home  |  
  • Contact Us  |  
  • Privacy  |  

Pioneer Power has joined Limbach, a leading building system solutions firm that specializes in revitalizing and maintaining budding systems in existing facilities, ensuring your buildings are always ready to perform when it matters most.

Please note that your services and contacts will remain the same, but you will now have access to additional resources as part of the Limbach family.

Learn More About Our Services Contact Our Team Learn More About the Acquistion